Jiangsu Dreibo new energy automobile manufacturing new plant covers an area of 600 mu, with a total construction area of about 230000m2.
Construction unit: Pizhou High-tech Zone Economic Development Construction Co., LTD
Supervision unit: Xuzhou Huasheng Construction Engineering Supervision Co., LTD
Construction unit: Jiangsu Yongcheng Construction and Installation Co., LTD
Jiangsu Yongcheng Construction Group Co., LTD. Construction projects:
Project name  | Structural form  | Number of floors  | Building height M  | Building area M2  | 
Office building  | Independent foundation/frame construction  | 5  | 16.35  | 7467.82  | 
Mess hall  | Independent foundation/frame construction  | 2  | 10.05  | 7014.57  | 
1# final assembly workshop  | Independent foundation/steel structure, grid frame  | One-storey factory building  | 18.9  | 19440  | 
2# final assembly workshop  | Independent foundation/steel structure, grid frame  | One-storey factory building  | 18.9  | 19440  | 
Outdoor ancillary works  | Road engineering, water supply and drainage engineering, pipe network engineering, street lamp engineering and sporadic small projects  | |||
| 
                        Last: Xuzhou nature Desenburg wood industry project
                         Next: Fengxian Sunlou street wooden staircase industrial park construction project  | 
                    
                
Copyright: Jiangsu Yongcheng Construction Group Co., LTD
Design and production: Winshang